Pasifik Energy
Pasifik Energy designs renewable energy solutions for a sustainable world.
Pasifik Energy defines its growth objectives through green energy and sustainability, and is making investments aligned with this perspective; aiming to complete these investments as soon as possible and transition to production.
In collaboration with Windrogen, which has obtained a preliminary license for the Arel Storage-Integrated Wind Power Plant (39.9 MWm/39.9 MWe + 39.9 MWh storage) in Edirne/Keşan, the company plans to generate 140 million kWh of electricity annually from the main source alone. Based on the studies conducted, the power plant, which has received positive results in its TEA and EIA reports, is expected to meet the annual energy consumption of 46,666 households and prevent the release of 56,000 tons of CO₂ into the environment. This initiative aims to prevent the emission of CO₂ equivalent to the amount that 2.6 million trees could absorb annually.
Genergy, a company based in Mardin with its own Taha Hybrid Natural Gas Combined Cycle Power Plant and a production license for 205 MWe, plans to generate 154 million kWh of electricity annually from a 93 MWe solar power plant to be constructed as an auxiliary source. This is expected to meet the annual energy consumption of 51,333 homes and prevent the release of 61,000 tons of CO₂ into the atmosphere. As a result, the project aims to prevent the release of CO₂ equivalent to the amount that 2.9 million trees can absorb annually.
Cetate GES (42 MW), located in Romania, has obtained a preliminary license and its field application projects are in the approval phase. The company plans to produce 58 million kWh of energy annually in collaboration with SEARA LA CETATE SRL. This is expected to meet the annual energy consumption of 19,533 homes and prevent the release of 23,440 tons of CO₂ into the atmosphere. This initiative aims to prevent the release of CO₂ equivalent to the amount that 1.1 million trees could absorb annually.
The Urlati GES (45 MWp + 85 MW storage) project in Romania, which has obtained its preliminary license and all necessary permits, is planned to produce 60 million kWh of energy annually in collaboration with Agronatura Green Energy SRL. This is expected to meet the annual energy consumption of 20,000 homes and prevent the release of 24,000 tons of CO₂ into the atmosphere. As a result, the project aims to prevent the release of CO₂ equivalent to the amount that 1.1 million trees could absorb annually.
By completing its current power plant investments, Pasifik Energy plans to begin energy production by 2026. In line with its growth objectives, the company aims to reach a total installed capacity of 500 MW over the next five years through domestic and international RES and GES investments.