Pasifik Energy defines its growth objectives through green energy and sustainability, and is making investments aligned with this perspective; aiming to complete these investments as soon as possible and transition to production.

In collaboration with Windrogen, which has obtained a preliminary license for the Arel Storage-Integrated Wind Power Plant (39.9 MWm/39.9 MWe + 39.9 MWh storage) in Edirne/Keşan, the company plans to generate 140 million kWh of electricity annually from the main source alone. Based on the studies conducted, the power plant, which has received positive results in its TEA and EIA reports, is expected to meet the annual energy consumption of 46,666 households and prevent the release of 56,000 tons of CO₂ into the environment. This initiative aims to prevent the emission of CO₂ equivalent to the amount that 2.6 million trees could absorb annually.

Genergy, a company based in Mardin with its own Taha Hybrid Natural Gas Combined Cycle Power Plant and a production license for 205 MWe, plans to generate 154 million kWh of electricity annually from a 93 MWe solar power plant to be constructed as an auxiliary source. This is expected to meet the annual energy consumption of 51,333 homes and prevent the release of 61,000 tons of CO₂ into the atmosphere. As a result, the project aims to prevent the release of CO₂ equivalent to the amount that 2.9 million trees can absorb annually.

Cetate GES (42 MW), located in Romania, has obtained a preliminary license and its field application projects are in the approval phase. The company plans to produce 58 million kWh of energy annually in collaboration with SEARA LA CETATE SRL. This is expected to meet the annual energy consumption of 19,533 homes and prevent the release of 23,440 tons of CO₂ into the atmosphere. This initiative aims to prevent the release of CO₂ equivalent to the amount that 1.1 million trees could absorb annually.

The Urlati GES (45 MWp + 85 MW storage) project in Romania, which has obtained its preliminary license and all necessary permits, is planned to produce 60 million kWh of energy annually in collaboration with Agronatura Green Energy SRL. This is expected to meet the annual energy consumption of 20,000 homes and prevent the release of 24,000 tons of CO₂ into the atmosphere. As a result, the project aims to prevent the release of CO₂ equivalent to the amount that 1.1 million trees could absorb annually.

By completing its current power plant investments, Pasifik Energy plans to begin energy production by 2026. In line with its growth objectives, the company aims to reach a total installed capacity of 500 MW over the next five years through domestic and international RES and GES investments.

DISCLAIMER



The information and some documents on this website may have become outdated. Pasifik Holding does not undertake any commitment to update this information. Some documents may include forward-looking statements and estimated figures. These reflect the Company management’s current views regarding future circumstances and include certain assumptions. However, actual developments, changes in variables that shape forward-looking views, and outcomes of assumptions may differ materially from expectations.

Pasifik Holding accepts no responsibility for any damages or losses that may arise from delays, incomplete, or incorrect information contained on this website.

Without the prior consent of Pasifik Holding management, no logo or proprietary information owned by us may be used by third parties for any other purpose.

This website has been prepared for informational purposes only. Nothing on this website is intended as an investment in the shares of Pasifik Holding or its Group companies. Pasifik Holding, its board members, executives, or employees shall not be held responsible for any damages arising from the use of this website or its content.